After review of the findings from the initial site investigation work, Gore is expanding the site investigation to include bedrock monitoring well installations at both on-site and off-site locations, additional shallow monitoring well installations at off-site locations, and collection of surface water samples and gauging water elevations at several surface water features around the site.