Based upon the analysis of data collected to date as part of the Cherry Hill site-investigation work plan, expanded locations for ground water monitoring wells were identified for installation on adjacent properties. The planned activities include installation and sampling of approximately eight shallow-depth monitoring wells and nine deeper, bedrock monitoring wells. The monitoring wells are expected to be installed over multiple mobilizations to accommodate access requirements. Additionally, one aquifer test well will be installed and tested.